1. Damage was found on 2x8 barge rafter. Roof covering was removed, the wood was replaced with new material. Roof covering was reinstalled.
2.
Three deck boards were removed and disposed of. New wood was installed.
3. 6x6 post was found to be damaged. A simple temporary support system for the covering next to the damaged post. The wood was detached and a new post was installed.
4. Wood railing was found to be damaged. The old wood was removed and replaced.